– 6,000 sq ft, two-phase interior renovation of existing terminal and mezzanine.
– Rebuild of the driver’s lounge, shop break and restroom
– Rework of the mechanical, plumbing and electrical systems
– Completed interior shop renovation for Iron Maintenance, a separate entity operating within the facility