The existing IR equipment was being replaced with new equipment from Philips. To facilitate this the room was demolished and new finishes were installed. The existing structural supports were upgraded to accept the new system. The existing floor had some deflection and needed to be fixed as the C-Arm in the room was dragging. During construction this issue was addressed with adjustments to the existing floor slab and structure at C-Arm attachment. All the services to the room were also adjusted to meet the requirements for the new equipment.