Guthrie General, Inc. was the CMAR for this 21,300 square foot interior build out. The Rhodes Rehab project was on a very aggressive seven month schedule.

This floor was originally designated for storage but it was decided that it would be better utilized for a 22 private room rehabilitation facility that included a dining room, family room, physical and occupational therapy gyms.

Guthrie General, Inc. was presented with numerous challenges for this project.

  • Aggressive seven month schedule
  • Reworking and additional under deck waste piping had to be performed above ceiling in the Intensive Care Unit and Pharmacy without interrupting patient care and staff operations
  • Maintaining strict infection control measures
  • A new air handler unit was installed in six components and set on a curb in an area with height restrictions. The existing floor to deck height caused numerous challenges for the installation of this mechanical system.

Key Facts

Client

Location

Sector

Category